Learn: Climate Risk

Climate risk register template: the columns AASB S2 needs

A climate risk register is the working record of an entity's climate-related risks and opportunities. For each, it records the type, timing, likelihood and consequence before and after controls, the owner and the materiality call. AASB S2 does not require a register by name. However, its disclosures are hard to support without one.

Key takeaways

  • AASB S2 paragraph 10 asks for each climate risk and opportunity, its physical or transition label and its time horizon, while paragraph 25 asks how they are managed.
  • In ASIC's review of 40 of the 312 reports for 31 December 2025 year ends, one entity disclosed a risk matrix without defining likelihood or consequence.
  • In the same sample, it was sometimes unclear whether a disclosed risk was rated before or after controls.
  • For a Group 2 entity's first year, the review under ASSA 5010 covers the risks and opportunities and their type, and the risk management process enters review in year two.
  • According to ASIC, sustainability records must be kept for seven years, and the AASB says a low likelihood, low impact risk can still be material.

What is a climate risk register, and does AASB S2 require one?

A climate risk register is a working list of an entity's climate-related risks and opportunities. It holds each one's type, timing, rating, owner and materiality call. AASB S2 does not require one by name. Instead, it requires disclosure of the risks and opportunities themselves, in paragraph 10. Paragraph 25 then asks how they are identified, assessed, prioritised and monitored.

The standard's full name is the Australian Sustainability Reporting Standard AASB S2 Climate-related Disclosures, and our guide to AASB S2 covers it more widely. In its words, climate-related risks are "the potential negative effects of climate change on an entity". Opportunities are "the potential positive effects". This article states the position as at 12 November 2026.

Three kinds of item belong in the register, because paragraph 3 names them. Physical risks can be acute, meaning event-driven, such as "storms, floods, drought or heatwaves", or chronic, meaning longer-term shifts in climatic patterns. Transition risks arise from the move to a lower-carbon economy, and the standard lists "policy, legal, technological, market and reputational risks". Opportunities are the third kind. In addition, paragraph 4 puts anything that "could not reasonably be expected to affect an entity's prospects" outside the standard. So the register does not need every conceivable climate effect.

Why do first reporters keep a register anyway?

A common claim is that AASB S2 requires a climate risk register. It does not. Rather, it requires the information and a description of the process, and a register is the natural place to hold both. In Report 839, published 21 September 2026, ASIC reviewed 40 of the 312 sustainability reports lodged for 31 December 2025 year ends. Some of those entities had "reviewed and updated risk registers in light of identified climate-related risks".

What columns should a climate risk register template include?

A climate risk register template needs four groups of columns. Identify: what the item is, its type, where it sits and the evidence. Assess: the scenario, the time horizon, likelihood, consequence, and ratings before and after existing controls. Decide: the reasoning, the materiality call and, for opportunities, commercial sensitivity. Monitor: the owner, the enterprise register link and the review dates.

Each column below names its reason: an AASB S2 paragraph, a finding from ASIC's Report 839 or a government source. The four tables are one register, so lay them side by side as the columns of a single sheet.

Identify: columns 1 to 6

1. ID

  • What to record: A reference that stays the same from year to year
  • Why it is there: Lets you trace each item across periods, which helps answer paragraph 25(a)(vi) on whether the process changed

2. Risk or opportunity

  • What to record: A short name, and whether it is a risk or an opportunity
  • Why it is there: AASB S2 paragraphs 3 and 10(a): describe the risks and opportunities that could reasonably be expected to affect prospects

3. Type

  • What to record: Physical (acute or chronic) or transition (policy, legal, technology, market or reputation)
  • Why it is there: Paragraph 10(b) and Appendix A. Reviewed in year one

4. Statement

  • What to record: The driver, what it affects and the consequence for the entity, in one sentence
  • Why it is there: DCCEEW's guide builds statements from drivers, values at risk, impact and consequence

5. Where it sits

  • What to record: Own operations, upstream or downstream value chain, and the location
  • Why it is there: ASIC found limited detail on geographic concentration and on value chain effects

6. Evidence and source

  • What to record: What the item rests on, including past events that affected the entity
  • Why it is there: Paragraph 11 and Appendix D paragraph [D]B9. ASIC found past weather events missing from risk lists

Assess: columns 7 to 13

7. Scenario

  • What to record: The climate scenario the rating applies to
  • Why it is there: Paragraph 25(a)(ii). For the resilience assessment, the Corporations Act requires at least two scenarios (ASIC RG 280.99)

8. Time horizon

  • What to record: Short, medium or long term, on the entity's own definitions
  • Why it is there: Paragraphs 10(c) and 10(d)

9. Likelihood

  • What to record: A rating against a written scale
  • Why it is there: Paragraph 25(a)(iii). ASIC found a matrix with no definition of likelihood

10. Consequence

  • What to record: A rating against a written scale
  • Why it is there: Paragraph 25(a)(iii). ASIC found no definition of consequence either

11. Inherent rating

  • What to record: The rating before controls
  • Why it is there: ASIC found it unclear whether disclosed risks were inherent or residual

12. Existing controls

  • What to record: What already reduces the risk
  • Why it is there: Explains the gap between columns 11 and 13

13. Residual rating

  • What to record: The rating after controls
  • Why it is there: The same ASIC finding

Decide: columns 14 to 16

14. Rating justification

  • What to record: Why each rating was given
  • Why it is there: DCCEEW calls justifications important, and RG 280 treats internal analysis as a record

15. Material?

  • What to record: Yes or no, with the reason
  • Why it is there: AASB S2's definition of material information and the AASB's March 2026 educational material

16. Commercially sensitive?

  • What to record: Opportunities only: whether the exemption is used, and why
  • Why it is there: Appendix D paragraphs [D]B34 and [D]B37 allow it for opportunities, never for risks

Monitor: columns 17 to 19

17. Owner

  • What to record: The person accountable for monitoring it
  • Why it is there: Paragraph 25(a)(v) asks how risks are monitored

18. Enterprise register link

  • What to record: The matching entry in the enterprise risk register, if there is one
  • Why it is there: Paragraph 25(c) asks how far the process is integrated with overall risk management

19. Review

  • What to record: Last reviewed, next review, what changed, and any trigger for an early review
  • Why it is there: Paragraphs 25(a)(v) and 25(a)(vi), and Appendix B paragraph B34

What does a completed row look like?

Illustrative only. This example, for an office-based services business, is adapted from the worked flood example in DCCEEW's template. It describes no real entity and implies no typical rating.

Risk or opportunity

  • Illustrative entry: Risk: flooding cuts staff access to the main office

Type

  • Illustrative entry: Physical, acute

Statement

  • Illustrative entry: Heavier rainfall events flood the roads around the main office, so staff cannot reach it and client work is delayed

Where it sits

  • Illustrative entry: Own operations, one named site

Evidence and source

  • Illustrative entry: Any past flood closures in the incident log, plus external hazard data for the site

Scenario

  • Illustrative entry: The higher warming scenario

Time horizon

  • Illustrative entry: Medium term, as the entity defines it

Likelihood, consequence, ratings

  • Illustrative entry: Each rated against the entity's written scales, before and after controls

Existing controls

  • Illustrative entry: For instance, remote working arrangements already in place

Where does this template come from?

It is built from the standard's paragraphs and ASIC's findings, then compared with the Australian Government's own register template. DCCEEW, the federal climate department, offers that template as a free download. It shares most of the columns above. However, it was built for the public sector, not for AASB S2 reporters. So anyone searching for a climate risk assessment template can use it as a reference, checked against the paragraphs above.

The register is one output of a wider process, which our page on climate risk and scenario analysis walks through from start to finish.

How do you rate climate risks without the mistakes ASIC found?

Write the likelihood and consequence scales down, and use the enterprise risk matrix where one exists. Then rate each risk before and after controls, and record why. ASIC found a first report that disclosed a risk matrix with no definition of likelihood or consequence. It also found disclosures that left unclear whether a risk was rated before or after controls.

Paragraph 25(a)(iii) asks how the entity assesses "the nature, likelihood and magnitude of the effects" of its climate risks. According to Report 839, some entities did not give enough information on this. One disclosed its risk matrix "But it did not provide a definition for likelihood and consequence". As a result, ASIC said, this "reduced users' ability to understand the significance of the risks". Columns 9 and 10 fix this only if the written scales sit with the register.

What is a climate risk matrix?

A climate risk matrix is a grid that plots likelihood against consequence to give each risk a rating. DCCEEW's example uses five levels of each. Its consequence levels run from "Insignificant" to "Catastrophic", and its likelihood levels from "Remote" to "Almost certain". Yet the standard prescribes no matrix size or scale, and DCCEEW's is only an example.

Most entities already have a matrix in their enterprise risk framework. DCCEEW's guide says that framework "will be able to provide the correct method" in most cases. It adds that "some modifications in risk evaluation criteria may be required" to capture climate risks across different scenarios.

Impact or consequence, inherent or residual?

DCCEEW's guide also separates impact from consequence. Impact is how the things you value are affected. Consequence is how the organisation is affected. For instance, a flooded road is an impact, while delayed client work is the consequence.

For inherent and residual, use ASIC's definitions. Inherent means "before mitigation factors were applied", and residual means "after mitigation factors were applied". ASIC said such disclosures "could have been improved by explaining the relevant assumptions and judgements applied". Separate columns, with the controls between them, make that easy.

Finally, expect one rating per scenario and time horizon. DCCEEW's guide gives each risk a row for every scenario and timeframe combination. So with two scenarios and three horizons, one risk becomes six rated rows.

What sources should feed a climate risk register?

Use all reasonable and supportable information available without undue cost or effort, including past events, current conditions and forecasts. That is AASB S2 paragraph 11. The standard names the entity's own risk management processes as a source, and says no exhaustive search is needed. Even so, ASIC found entities that left out weather events they had already reported.

Appendix D of AASB S2 lists "the entity's risk management processes; industry and peer group experience; and external ratings, reports and statistics" as possible sources. Internally, that means the existing risk register, incident and insurance records, asset and site lists, and supplier lists.

Past events matter most. According to Report 839, some entities had previously disclosed assets or operations "financially affected by extreme weather events". Nevertheless, they had not identified or disclosed similar risks to their prospects. An evidence column that starts from the incident log closes that gap.

Externally, the National Climate Risk Assessment is the obvious starting point. According to ASIC and the AASB's learning module, the Australian Government released it in September 2025. It describes 11 priority risks at three warming levels (1.5°C, 2.0°C and 3.0°C) and three time horizons: current, 2050 and 2090. CSIRO says the first pass identified 63 nationally significant climate risks. In ASIC's sample, the most common physical risks were flooding, cyclone, bushfire or drought (acute) and heatwaves affecting productivity (chronic).

What about the value chain and opportunities?

ASIC also found "high-level or limited information" on where risks were concentrated, particularly by geography. It said entities could have better explained indirect effects, such as risks to "roads, railways and other infrastructure" their business model relied on. So the register needs rows for suppliers and infrastructure, not only for sites you own. Our explainer on physical and transition risk covers both types in more depth.

Opportunities need their own rows, because paragraph 25(b) asks for the opportunity process too. That is why a climate risk and opportunity assessment template treats both in one register. In ASIC's sample, common opportunities included "infrastructure resilience and adaptation services" and "new product and customer segments associated with decarbonisation".

How does a climate risk register help decide what is material?

The register informs the materiality call, but it does not make it. Under AASB S2, information is material if omitting, misstating or obscuring it could reasonably be expected to influence decisions by the report's primary users. So a low-rated risk can still be material, and the judgement is reassessed at every reporting date.

The AASB's March 2026 educational material is plain about this. A risk with "a low likelihood of occurring and a low impact might still be material" if primary users could reasonably take a different view. Likewise, information "cannot be assumed to be immaterial simply because users have not asked for it". For that reason, column 15 records a judgement and its reason, not a threshold read off the matrix.

ASIC's report gives a better practice example. One entity assessed a range of physical risks and concluded none were material. "Instead of simply stating this conclusion", it explained the adaptation measures in place and how they "reduced the residual risk exposure". In other words, that explanation came from the residual rating and the controls column.

A "no material risks" conclusion carries weight. In ASIC's sample of 40, 95% identified at least one climate-related risk or opportunity. Two entities identified none, and for each, the auditor added an emphasis of matter paragraph highlighting the judgement. ASIC encourages entities to "keep adequate records of the process undertaken to identify them". Treasury's August 2026 consultation floated further guidance on when an entity may reach that conclusion. Submissions closed on 2 October 2026, and as at 12 November 2026 we found no published outcome.

What will the auditor look at in year one, and what has to be kept?

For a Group 2 entity's first year, meaning financial years starting between 1 July 2026 and 30 June 2027, the review reaches two things the register holds: the risks and opportunities, and whether each is physical or transition. Risk management processes enter review in year two. Meanwhile, the working papers behind the report must be kept for seven years.

Under ASSA 5010 paragraph 10(a), the AUASB's assurance timeline, the first-year review reaches four things. They are governance, strategy at AASB S2 subparagraphs 9(a), 10(a) and 10(b), Scope 1 and 2 emissions, and any statement that there are no material climate risks or opportunities. So columns 2 and 3 feed what is reviewed first. From year two, the review extends to all disclosures. However, none of this means the other columns can wait. AASB S2 requires the time horizons, the scenarios and the process disclosures from year one; only the review is phased. Our article on what auditors test first covers the review in more detail.

What does the register have to keep?

ASIC's Regulatory Guide 280 says entities "must keep written sustainability records", and that failing to do so "is a strict liability offence". Records include "internal reports or analysis" and "working papers or documents evidencing inputs for, and assumptions used in" the report. They "must be retained for seven years". A register with its rating justifications is that kind of record, and one kept through the year shows the process as it ran.

Keep the register's history, not only its latest state. Paragraph 25(a)(vi) asks whether the process changed from the previous period, and old versions answer that. In addition, Appendix B paragraph B34 requires a reassessment across the value chain after "a significant event or a significant change in circumstances". A review trigger in column 19 makes that visible.

Where Trace fits

Trace's Climate Risk and Scenario Analysis workstream includes a risk register, 1.5°C and 3°C scenarios, a ranking workshop, and a methodology and audit trail. In the workshop, guided by Trace's team, each risk is rated for likelihood and consequence under each scenario and time horizon, before and after existing controls. AI and experts do the work together. Our climate risk assessment service suits a mid-sized Australian entity without a sustainability team that wants a proportionate result from software plus specialists. An asset-heavy organisation that needs bespoke physical asset modelling may prefer a specialist provider instead.

Frequently asked questions

What is a climate risk register?

A climate risk register is the working record of an entity's climate-related risks and opportunities. For each one, it records whether it is physical or transition, the time horizon, the scenario, likelihood and consequence ratings before and after controls, the owner and the materiality call. It supports the disclosures in AASB S2 paragraphs 10 and 25.

Is a climate risk register required under AASB S2?

Not by name. AASB S2 requires disclosure of the climate-related risks and opportunities that could reasonably be expected to affect prospects (paragraph 10). It also requires the processes used to identify, assess, prioritise and monitor them (paragraph 25). A register is the natural place to hold that information, and ASIC saw first reporters update theirs.

What is a climate risk matrix?

A climate risk matrix is a grid that plots likelihood against consequence to give each climate risk a rating. DCCEEW's example uses five levels of each. AASB S2 sets no size or scale. However, ASIC found a first report that showed a matrix without defining likelihood or consequence, so write your scales down.

Should climate risks go in the enterprise risk register or a separate one?

Either can work. AASB S2 paragraph 25(c) asks entities to disclose how far their climate risk processes are integrated into overall risk management, so record the link either way. DCCEEW's guide notes that an existing enterprise framework usually provides the method, with some changes to capture climate risks across scenarios.

How often should a climate risk register be updated?

At least once each reporting period, because AASB S2 requires materiality judgements to be reassessed at each reporting date. In addition, AASB S2 requires a reassessment after a significant event or change in circumstances. Paragraph 25 also asks how risks are monitored and whether the process changed, so keep each version.

About the author

Trace is a climate reporting platform with in-house specialists, founded in 2020 with offices in Sydney and London. It helps Australian organisations measure emissions and prepare AASB S2 climate disclosures.

Reviewed by Joanna Auburn, Co-founder and Chief Product Officer of Trace.

Related reading

This article is general information about Australian climate reporting requirements as at the date shown. It is not legal, accounting or assurance advice.

Sources

All read on 12 November 2026 and checked again against the primary documents on 13 November 2026.

Standards and the standard setters

Regulators and government

Related reading

Minimum Viable Compliance: What ASRS Year One Actually Requires
Read More
The Real Cost of Delaying ASRS Preparation
Read More
What Finance Leaders Told Us About Mandatory Climate Reporting
Read More
ASRS S2 and AASB: The Full Explainer
Read More
Free ASRS resources
for mandatory reporters.
ASRS Strategy On A Page

A one-page visual of the four AASB S2 pillars, what each requires, key deadlines, and the step-by-step compliance path. Start here if your team is scoping what ASRS S2 actually involves.

Download
The ASRS Pulse Report 2025

Benchmark your readiness against 20+ ASRS compliant Australian companies. Includes buying criteria, support gaps, and how first-round filers are approaching year one.

Download
The ASRS Prep Pack 2026

Templates, checklists and frameworks to start your AASB S2 implementation. Built for finance and sustainability leads who are ready to move.

Download
AASB Readiness Assessment

A 5-minute self-assessment. Get a compliance gap map and personalised next steps, scored against the four AASB S2 pillars.

Download

Ready to simplify your climate disclosure?

Trace works with businesses at every stage of their mandatory reporting journey, from first emissions measurement to audit-ready ASRS S2 disclosure. Talk to our team to see how we can help.

Newsletter:  Climate Reporting Simplified.
This monthly edition unpacks what mandatory climate reporting really requires and how to minimise cost, disruption & confusion.

💚 Don’t worry, we won’t spam!

London - Sydney

© Copyright 2026 Trace | All Rights Reserved