Current and anticipated financial effects under AASB S2, explained

Under the Australian Sustainability Reporting Standard AASB S2 Climate-related Disclosures, current financial effects are what climate-related risks and opportunities did to an entity's financial position, performance and cash flows this reporting period. Anticipated financial effects are what it expects over the short, medium and long term. Paragraphs 15 to 21 require both, in numbers and words.

Key takeaways

  • Paragraph 16 asks for four things: effects this period, carrying amounts at significant risk of material adjustment next year, and expected changes to financial position, and to performance and cash flows.
  • You use reasonable and supportable information available without undue cost or effort, and information already used for the financial statements, the business model, strategy and risk management counts as available.
  • Words can replace numbers in three defined cases, but you must explain why, name the affected line items and give a combined figure where that is useful.
  • Of the 40 first-wave Group 1 reports ASIC reviewed, 37.5% gave financial effects in words only, and some skipped the paragraph 21 steps.
  • For a Group 2 entity, financial effects are not reviewed in year one, and are reviewed from year two (for a June year end, the financial year starting 1 July 2027).

What are current and anticipated financial effects under AASB S2?

AASB S2 defines both kinds in paragraph 15, inside its strategy requirements. Current financial effects are the effects of climate-related risks and opportunities on financial position, performance and cash flows for the reporting period. Anticipated financial effects are the expected effects over the short, medium and long term, taking account of the entity's financial planning.

A few climate terms first, because the standard leans on them. According to AASB S2 Appendix A, climate-related risks are the potential negative effects of climate change on an entity, and opportunities are the potential positive ones. Risks come in two kinds. Physical risks arise from events such as floods and heatwaves, or from longer-term shifts in rainfall and temperature. Transition risks, by contrast, arise from the move to a lower-carbon economy, such as new regulation, technology or market shifts.

The requirement sits in the strategy pillar, as item 9(d), alongside the risks and opportunities themselves. For a map of how those pillars fit together, start with the AASB S2 hub.

The AASB's own educational material gives a simple pair of examples. A flood insurance premium already incurred is a current financial effect. An expected investment in energy-efficient equipment is an anticipated one. The AASB calls the information a "complementary perspective" on how the financial statements are expected to be affected. So it adds to the accounts rather than repeating them.

The time horizons are yours to set. Under paragraph 10(d), you explain how you define short, medium and long term. You also explain how those definitions link to the planning horizons you already use for strategic decisions.

What does paragraph 16 ask you to disclose?

Paragraph 16 asks for quantitative and qualitative information about four things. One looks back: the effects in the reporting period. Three look forward: carrying amounts at significant risk of material adjustment within the next annual reporting period, how financial position is expected to change, and how financial performance and cash flows are expected to change.

16(a)

  • What it asks for: Effects on financial position, performance and cash flows for the reporting period
  • Example: Capital or operating spend on mitigation or adaptation already in the accounts (ASIC's example)

16(b)

  • What it asks for: Risks and opportunities with a significant risk of a material adjustment to carrying amounts of assets and liabilities within the next annual reporting period
  • Example: An impairment test on an asset exposed to a physical risk (illustrative)

16(c)

  • What it asks for: How financial position is expected to change, given investment and disposal plans and planned sources of funding
  • Example: A capital programme in the budget, and how it will be funded (illustrative)

16(d)

  • What it asks for: How financial performance and cash flows are expected to change
  • Example: Revenue from lower-carbon products, damage to assets from climate events, adaptation or mitigation costs (the standard's own examples)

Which parts will look familiar to an accountant?

Item 16(b) will look familiar to an accountant. According to the AASB, it "is similar to the requirements in Australian Accounting Standards" on sources of estimation uncertainty. For a financial year starting 1 July 2026, that disclosure still sits in AASB 101 paragraph 125. It moves to AASB 108 paragraph 31A for periods beginning on or after 1 January 2027.

Item 16(c) also reaches further than many finance teams expect, because it covers investment and disposal plans "including plans the entity is not contractually committed to". In other words, an approved capital plan counts even before the contracts are signed.

Paragraph 17 lets you give a single amount or a range. In addition, the AASB notes that "sometimes a range is useful or more appropriate than a single amount", for instance where uncertainty is high.

How do the numbers connect to the financial statements?

Under AASB S2 Appendix D, the climate disclosures cover the same reporting entity and the same reporting period as the financial statements. They also use the same presentation currency. Data and assumptions are consistent with the financial statements "to the extent possible", and significant differences are disclosed.

You may cross-refer to the notes, provided the information is available on the same terms and at the same time. ASIC's Report 839 shows why the link matters. It described one entity that recorded an impairment on an investment project tied to a disclosed climate-related opportunity. Yet its sustainability report did not describe the impairment at all.

How much work does AASB S2 expect for anticipated financial effects?

Paragraph 18 sets two proportionality mechanisms. You use all reasonable and supportable information available at the reporting date without undue cost or effort. You also use an approach commensurate with the skills, capabilities and resources available to you for preparing the disclosures. Both scale the work, and neither removes the requirement.

The reassuring part is what counts as available. Appendix D paragraph B9 says information used in preparing the financial statements, operating the business model, setting strategy and managing risks is considered available without undue cost or effort. The AASB adds that, for these disclosures, an entity "does not need to carry out an exhaustive search for information". So the budget, the capital plan and the board papers are the natural starting point.

The numbers need not be sophisticated either. The AASB gives the planned investment in energy-efficient equipment in the "near-term budget" as an example of quantitative information. Similarly, ASIC points to board-approved mitigation or adaptation plans as an area where measurement certainty may be greater in the early years. That fits the Minimum Viable Compliance approach: doing what the standard asks, properly, without building more than it needs.

Two limits apply, however. According to the AASB, the mechanism "does not exempt an entity from disclosing information". The AASB also notes, citing the ISSB, that a lack of skills is not a reason to leave out numbers if the entity has the resources to obtain or develop those skills.

When can you describe financial effects in words instead of numbers?

AASB S2 allows a qualitative disclosure in three cases. The effects are not separately identifiable, or the measurement uncertainty is so high that a number "would not be useful" (paragraph 19). For anticipated effects only, the entity also lacks the skills, capabilities or resources (paragraph 20). Each case then triggers three paragraph 21 steps.

Under paragraph 21, an entity that gives words instead of numbers must:

  1. Explain why it has not provided quantitative information.
  2. Give qualitative information about the effects, including the line items, totals and subtotals in the financial statements likely to be affected, or already affected.
  3. Give quantitative information about the combined financial effects, unless it determines that a combined figure would not be useful.

The first two reliefs depend on the nature of the effect, rather than on the entity's maturity. According to the AASB, they "apply to all entities irrespective of their resources and experience", so they are not only a first-year allowance.

Separately, two exemptions remove information altogether. One applies where law or regulation prohibits the disclosure (Appendix D paragraph B33). The other covers a commercially sensitive climate-related opportunity, and Appendix D paragraph B37 bars its use for a risk or "as a basis for broad non-disclosure".

In one AASB illustration, a retailer cannot isolate flood risk within its rising insurance premiums, so it discloses the combined increase as a range.

Are anticipated financial effects the same as scenario analysis?

No. Anticipated financial effects reflect the entity's current plan and expectations. Climate resilience, under paragraph 22, is the capacity to adjust to climate-related change, and scenario analysis tests how that plan would fare under different climate futures. ASIC says plainly that "these requirements are different", and the AASB says scenario analysis is required only for the resilience assessment.

The confusion shows up in real reports. ASIC saw some reports where the two were not considered separately: the resilience section carried financial effects drawn from scenario analysis, while the report omitted what appeared to be material information about anticipated financial effects under paragraph 16.

Scenario analysis can still inform an estimate. In one AASB illustration, scenario work on water scarcity supports a medium-term estimate, while the long-term effect is left qualitative. Even so, a scenario model is not a precondition for paragraph 16. The resilience side is covered in the climate risk assessment hub.

What did ASIC find in the first AASB S2 reports?

ASIC's Report 839 reviewed 40 of the 312 sustainability reports lodged for 31 December 2025 year ends, or 13%, all from Group 1 entities. Of that sample, 37.5% gave financial effects only in words, with no number or range. In addition, 57.5% relied on measurement uncertainty to some extent.

What was missing matters most for a first-time preparer. Some reports did not explain, in line with paragraph 21, why no number was given. Others did not identify the affected line items, totals and subtotals. Some also failed to show clearly how the sustainability report connected to the financial report.

ASIC also described better practice. One entity could not give a point estimate because of measurement uncertainty. Instead, it ran a sensitivity analysis and disclosed a range of potential effects, expressed as percentage changes to its future cash flows under disclosed assumptions.

Overall, ASIC saw "opportunity for improvement in forward-looking disclosures and those underpinned by assumption or judgement". Anticipated financial effects are exactly that kind of disclosure.

When are financial effects assured, and what about liability?

Under the AUASB's ASSA 5010, a Group 2 entity's first year starts between 1 July 2026 and 30 June 2027. That year's review covers governance, the risks and opportunities in paragraphs 9(a), 10(a) and 10(b), Scope 1 and 2 emissions, and any no material risks statement. Financial effects are reviewed from year two.

Year 1

  • Financial years starting: 1 July 2026 to 30 June 2027
  • Financial effects: Not reviewed, but still required

Years 2 and 3

  • Financial years starting: 1 July 2027 to 30 June 2029
  • Financial effects: Limited assurance (a review of all disclosures)

Year 4 onwards

  • Financial years starting: On or after 1 July 2029
  • Financial effects: Reasonable assurance (an audit of all disclosures)

Source: AUASB, ASSA 5010, compilation registered 15 January 2026.

"Not reviewed" never means "not required". The year-one disclosure is still part of the sustainability report. It also becomes the baseline a reviewer reads against in year two. For more on that scope, see what auditors actually test.

What about liability for forward-looking estimates?

ASIC's Regulatory Guide 280 describes modified liability settings. Under them, only criminal action or action by ASIC can be brought over "protected statements" in the sustainability report. The general protection for climate statements about the future covers reports for financial years starting in 2025 only. That is before any Group 2 first year begins.

A narrower protection, for statements about Scope 3 emissions, scenario analysis or a transition plan, runs to financial years starting by 31 December 2027. Whether a particular financial effects estimate falls inside it is a question for legal advice.

Either way, RG 280 sets a standard for anything forward-looking. It says some representations about future matters will be taken to be misleading unless there are reasonable grounds for them, judged when they are made. It also says entities must keep records of the methods, assumptions and evidence behind all forward-looking climate information.

Is any of this changing?

As at 14 November 2026, paragraphs 15 to 21 were not changed by the AASB's December 2025 amendments, which dealt with greenhouse gas emissions relief. No AASB exposure draft on AASB S2 was open for comment either. However, Treasury's August 2026 consultation suggested the proportionality mechanisms "could be further defined", and it also floated changes to the assurance phasing. The outcome had not been published on that date.

How should a finance team approach anticipated financial effects in its first year?

Start from what the business already plans and budgets, not from a model. Then decide, risk by risk, whether a number is supportable, and document the reason either way. That record turns a judgement into something a reviewer can follow. It is also what RG 280 expects you to keep.

A practical order of work:

  1. Take the material risks and opportunities from your paragraph 10 work, with the time horizons you defined there.
  2. Collect what is already available: the budget, the capital expenditure plan, insurance renewals and board-approved mitigation or adaptation actions.
  3. For each risk or opportunity, give a single amount or a range where the information supports one.
  4. Where it does not, name the paragraph 19 or 20 reason, then complete the three paragraph 21 steps.
  5. Check the data and assumptions against the financial statements, and note any significant differences.
  6. Record the assumptions and judgements, and identify any amounts with high measurement uncertainty.

Some organisations want specialist help with the numbers themselves. Trace offers financial quantification of climate risk as a consulting service, not through its platform. It is scoped case by case, because the right approach depends on the organisation. Highly complex or bespoke environments, such as mining, energy infrastructure or complex financed emissions, are a deliberate poor fit for Trace and may suit a specialist modelling firm better.

What this means for you

The information you already use to run the business and set strategy is the start, and the standard treats it as available. Where you decide words are the honest answer, the written reason is what a reviewer will read from year two. So it deserves the same care as a number.

Frequently asked questions

What is the difference between current and anticipated financial effects?

Current financial effects are what climate-related risks and opportunities did to financial position, performance and cash flows in the reporting period, such as a flood insurance premium already paid. Anticipated financial effects are what you expect over the short, medium and long term, such as planned investment in energy-efficient equipment. AASB S2 paragraph 15 requires both.

Do we have to put a dollar figure on anticipated financial effects?

Not always, although numbers and words are the default. AASB S2 lets you use words alone where effects are not separately identifiable, where uncertainty makes a number not useful, or where you lack the skills, capabilities or resources. You must then explain why, name the affected line items and give a combined figure where useful.

Are anticipated financial effects assured in the first year of AASB S2?

No. Under the AUASB's ASSA 5010, a Group 2 entity's first year (for a June year end, the financial year starting 1 July 2026) is reviewed only for governance, the risks and opportunities, Scope 1 and 2 emissions and any no material risks statement. Financial effects are reviewed from year two. However, they must still be disclosed in year one.

Do we need scenario analysis to estimate anticipated financial effects?

No. ASIC's Report 839 says the two requirements are related but different. Anticipated financial effects reflect your current plan and expectations, while scenario analysis tests how that plan fares under climate scenarios. The AASB says AASB S2 requires scenario analysis only for the climate resilience assessment, although it can inform an estimate.

Can what we disclose about financial effects be used against us?

ASIC's Regulatory Guide 280 describes limited protections. The general protection for forward-looking climate statements covers only financial years starting in 2025, before any Group 2 first year. A narrower one, for Scope 3, scenario analysis and transition plans, runs to financial years starting by 31 December 2027. Otherwise, forward-looking statements need reasonable grounds and records.

About the author

Trace is a climate reporting platform with in-house specialists, founded in 2020 with offices in Sydney and London. It helps Australian organisations measure emissions and prepare AASB S2 climate disclosures.

Reviewed by Joanna Auburn, Co-founder and Chief Product Officer of Trace.

Related reading

This article is general information about Australian climate reporting requirements as at the date shown. It is not legal, accounting or assurance advice.

Sources

Every source below was read at the primary document on 14 November 2026. The position stated is as at that date.

Standards and the standard setters

Assurance standard

Regulators and government

Background

Related reading

Minimum Viable Compliance: What ASRS Year One Actually Requires
Read More
The Real Cost of Delaying ASRS Preparation
Read More
What Finance Leaders Told Us About Mandatory Climate Reporting
Read More
ASRS S2 and AASB: The Full Explainer
Read More
Free ASRS resources
for mandatory reporters.
ASRS Strategy On A Page

A one-page visual of the four AASB S2 pillars, what each requires, key deadlines, and the step-by-step compliance path. Start here if your team is scoping what ASRS S2 actually involves.

Download
The ASRS Pulse Report 2025

Benchmark your readiness against 20+ ASRS compliant Australian companies. Includes buying criteria, support gaps, and how first-round filers are approaching year one.

Download
The ASRS Prep Pack 2026

Templates, checklists and frameworks to start your AASB S2 implementation. Built for finance and sustainability leads who are ready to move.

Download
AASB Readiness Assessment

A 5-minute self-assessment. Get a compliance gap map and personalised next steps, scored against the four AASB S2 pillars.

Download

Ready to simplify your climate disclosure?

Trace works with businesses at every stage of their mandatory reporting journey, from first emissions measurement to audit-ready ASRS S2 disclosure. Talk to our team to see how we can help.

Newsletter:  Climate Reporting Simplified.
This monthly edition unpacks what mandatory climate reporting really requires and how to minimise cost, disruption & confusion.

💚 Don’t worry, we won’t spam!

London - Sydney

© Copyright 2026 Trace | All Rights Reserved